Skip to content

We're seeking registrations of interest from suitably qualified and experienced organisations for the provision of Reclosers and Load Break Switches for use on the South West Interconnected System (SWIS).

Reclosers and Load Break Switches are single or three phase devices deployed on the medium voltage (up to 33kV) overhead distribution network to provide switching, isolation, and protection capabilities across the network. Reclosers are primarily utilised to detect, interrupt and automatically restore supply following downstream faults, thereby reducing the impact of transient faults, and improving overall -network reliability.

Load break switches provide safe, reliable, and frequent switching under normal network operating conditions, supporting network sectionalising, back-feeding, and operational reconfiguration activities. Both device types require remote monitoring and automated operational functionality to support modern distribution automation initiatives, enhance operational efficiency, and improve visibility across the network. 

The scope of work includes: 

  • Insurance
  • Design
  • Manufacture
  • Testing and certification
  • Packaging
  • Delivery
  • Technical documentation
  • Technical support and warranty rectification
  • Training (optional)

All items shall be designed, manufactured, and tested in full compliance with all applicable Australian and international standards, together with all applicable Western Power standards and technical requirements.  

Registration Requirements

Step

Action

Details

1

Complete the ROI Questionnaire

Respond to all questions in the Registration of Interest questionnaire (ROI -P02299 - Reclosers and Load Break Switches)

If you need to attach supporting documents, please email them to:
shiqi.hu@westernpower.com.au

2

Register Online

Submit your ROI

3

Include the Event Number

Ensure your registration clearly references the event number P02299 - Reclosers and Load Break Switches

4

Submission Deadline

Submit all registrations by 2:00 PM AWST, Friday 27 February 2026

 

Registrations of interest

Contact information

Company information

Registration of interest

Organisation safety record (including any subcontractors working for you)

Has your organisation, including parent and subsidiary entities, been fatality free for the last five years?

Total Recordable Injury Frequency Rate (TRIFR) TRIFR further information

Supporting documents

Drop a file here or browse to upload

Allowed file types: JPG, PDF, XLSX

Maximum upload size: 30 mb

Next Steps 

We'll review and evaluate the registrations received against the scope requirements after the closing date. 

Please note that registering for the opportunity does not guarantee that you will be invited to participate in a market event or become a supplier of Western Power.