Skip to content

Enquiry

share icon

Who is this for?

All major customers that require a new or modified connection to the South-West Interconnected System (SWIS).  

clock icon

How long will it take?

12 weeks*

dollar icon

How much will it cost?

$30,000* (excluding GST)


 
1
Enquiry
2
Initiation
3
Scoping
4
Planning
5
Execution

In the enquiry stage, we identify a suitable network connection option so you can assess your project’s feasibility and prepare a Connection Application. Depending on your requirements, you can choose either a Capacity Check Assessment or a Connection Options Assessment (COA). 

To start an enquiry for a new connection, or change an existing connection point, complete and submit an enquiry form via MyWP projects portal.  . 

Capacity Check 

A Capacity Check includes: 

  • identifying network capacity  
  • considering your project requirements, such as Dynamic (RMS) studies, Remote Monitoring and Control (RMC), and network standards. 
Estimated cost* Estimated timeframe* What we need from you
$5,000 (excluding GST) 4 weeks Enquiry form submitted

Connection Options Assessment 

A Connections Option Assessment includes: 

  • identifying connection options that meet the requirements in your enquiry form, including any network modifications needed to enable the proposed connection '

  • running connection studies (steady state, import and export power flow analysis, voltage, and thermal limit performance), to determine network modifications your application requires
  • completing transmission network impact assessment and clearance, if required 

  • a workshop with our planning engineers to present, discuss, and refine the connection options

  • developing a high-level scope of work, an AACE Class 5** cost estimate, and a high-level time estimate for each connection option

  • providing all of this to you in a Connection Options Assessment pack 

A Connection Options Assessment does not include identifying or assessing economic, market or network constraints, or the network modifications needed to address them. 

Estimated cost* Estimated timeframe* What we need from you
$30,000 (excluding GST) 12 weeks Enquiry form submitted

Submit a project enquiry

Looking to connect a distribution load ≥ 10MVA, any large generator ≥ 1MVA or a large distribution connected generator(≥1MVA) coupled with a distribution load.

* The estimated costs and timeframes shown above are to be used as a guide and will vary depending on project specifics, such as facility size, connection voltage, complexity and geographic etc. The durations are based on all customer deliverables having been received and with no queuing time. Some activities may be able to happen in parallel. 

** Association for the Advancement of Cost Engineering (ACCE)International Estimation Standard