Reliability information

This includes all unplanned interruptions (excludes planned interruptions and interruptions lasting one minute or less). The reliability data includes delays to restoration due to bushfire settings.

68 hours & 46 minutes

average time without power in 2022/2023 per customer

16 interruptions

on average per customer in 2022/2023

Scheduled work in 2023/2024

Maintenance on:
  • 59 poles and associated equipment
  • 1 earthing
Replacement of:
  • 1 drop out fuse
  • 25 insulators
  • 10 overhead switchgear
  • 4 stay wires and stay insulators
  • 52 wood poles
  • 3 surge arrestors
  • 16 distribution cross arms and insulators
  • 4 distribution pole cross arms
  • 6 meter replacements
  • 2 luminaires