Skip to content

Reliability information

This includes all unplanned interruptions (excludes planned interruptions and interruptions lasting one minute or less). The reliability data includes delays to restoration due to bushfire settings.

17 hours & 54 minutes

average time without power in 2022/2023 per customer

9 interruptions

on average per customer in 2022/2023

Scheduled work in 2023/2024

Maintenance on:
  • 32 poles and associated equipment
  • 5 distribution earthings
  • 1 groundmounted switchgear
  • 11 overhead switchgear
  • 75 reinforce wood poles
Replacement of:
  • 1 drop out fuse
  • 36 insulators
  • 11 overhead switchgear
  • 3 stay wires and stay insulators
  • 120 wood poles
  • 1 metal pole
  • 3 surge arrestors
  • 54 distribution pole cross arms
  • 263 luminaires
  • 1 sectionaliser