The high voltage (HV) subdivision pool allows the cost of installing HV infrastructure to be shared among developers of residential subdivisions. The pool reimburses developers who have paid for more than their share of the HV infrastructure, and collects funds from developers who make use of excess capacity on that infrastructure.

HV subdivision pool charges and parameters

This table outlines current charges and parameters under which the HV pool operates. These are updated every six months or when the HV pool balance is seen to be trending towards a larger deficit balance, whichever comes first.

Baseline Accumulated HV Pool Payment * Size and units

System Charge Rate *

$250 /kVA

Baseline Accumulated HV Pool Payment *

$17,290,878

Baseline Accumulated Design Load *

68,374kVA

Baseline System Charge *

$253 /kVA

Date of the HV Pool System Charge Reset

01/01/2026

Accumulated HV Pool Payments*

$286,292,987

Accumulated HV Pool Charges*

$287,673,817

Accumulated Design Load*

1,171,710 kVA

* at the time of system charge re-set