Skip to content

Does my existing dwelling need to be connected through a site main switchboard?

All lots and dwellings subject to the strata development are required to be connected through the site main switchboard and into one connection point in the pillar.

Examples of small strata connection arrangements can be found in the Switchboard Arrangement for Small Strata Lot Developments guideline.