What more do I need to know about a simple multiple-residential connection?

  • Your point of connection to the electricity network will either be single phase or three phase, depending on the surrounding network
  • Wherever possible we will provide an underground connection via a green dome
  • There are some physical clearances that are required between the electricity network and your equipment
  • You will need an electrical contractor to install your meter and terminate your consumer mains
  • If your consumer mains are larger than 35mm2, we will need to terminate them for you instead
  • If you have a 3 or 4 lot strata and would like to request a dedicated pillar, please indicate this on your site plan