High Voltage Procedures

These procedures have been developed to provide qualified and authorised high voltage (HV) live workers with standardised methods of HV live work. The procedures include the roles and responsibilities expected of HV live workers to create and maintain a safe working environment that meets state and national legislation, standards and work practices. All relevant staff must be issued with these procedures and follow them at all times.

There are three sets of HV live work procedures:
High Voltage Live Work Procedures – Distribution Insulated Stick
High Voltage Live Work Procedures – Glove and Barrier
High Voltage Live Work Procedures – Transmission Insulated Stick