Western Power conducts line maintenance work throughout the year. This challenging but very important work involves using a helicopter to conduct routine maintenance of high voltage transmission lines.

Farmers should consider moving livestock from paddocks with powerlines as the helicopter has to hover low and may need to land for closer inspections and refuelling.

Scheduled inspections for September and October 2017

Transmission line name Areas line connects
CGT-YLN X1 Collgar Terminal Yilgarn
YLN-WKT X1 Yilgarn West Kalgoorlie Terminal
CPS-SHO 91 Collie Power Station Shotts
MU-BLW 91 Muja Bluewaters 
SHO-WLT 91 Shotts Wells Terminal
WCL-WOR 81 Western Collaries Limited Worsley
KDN-MRT X1 Kondinin Merredin Terminal
MOR-WGH 61 Moora Wongan Hills
CT-MSS/PNJ 81 Cannington Terminal, Meadow Springs Pinjarra 
SNR-WGP/APJ 81 Southern River, Wagerup Alcoa/Pinjarra
GLT-ST 91 Guildford Southern Terminal
KDN-BNY 81 Kondinin Bounty
MU-NGS X1 Muja Narrogin South
MU-NT 91 Muja Northern Terminal
NGS-KDN X1 Narrogin South Kondinin
KOJ-ALB 81 Kojonup Albany
KW-KEM/OLY 91
LWT-SHO/KEM 91
MU-KEM 91
Kwinana, Kemerton Oakley
Landwehr Terminal, Shotts Kemerton
Muja Kemerton 
KW-ST 91 Kwinana Southern Terminal
PIC-PNJ/BSN KEM 81 Picton Pinjarra Busselton Kemerton
CT-MSS/PNJ 81 Cannington Terminal, Meadow Springs Pinjarra 
PNJ-APJ 81 Pinjarra Alcoa/Pinjarra
SHO-ST/OLY 91 Shotts, Southern Terminal Oakley

Dates may change due to the weather and other unforeseen factors. 

Keep informed of upcoming aerial works in your area

Submit an accessing your property form
phone.svg

Need to speak to someone?

We're here to help.
Call us on 13 10 87 (7am-5pm Monday to Friday) or
email your enquiry to enquiry@westernpower.com.au