Skip to content

REGISTRATION OF INTEREST (ROI) 
PERIODIC SUPPLY OF DISCONNECTORS AND EARTH SWITCHES WITH A RATED VOLTAGE OF 362KV AND CURRENT OF 4000A 

The Organisation
Western Power is a Western Australian State Government owned corporation responsible for building, maintaining and operating an electricity network that connects our 2.3 million customers to traditional and renewable energy sources, delivering an essential service to our community.

The Scope

Western Power is seeking registrations of interest from suitably qualified and experienced organisations, for the provision of:

Western Power requires supply and delivery of Disconnectors and Earth Switches with a rated voltage of 362kV and a rated current of 4000A for use on the South West Interconnected System (SWIS).

Services required under the project would include:

•    Assembly
•    Installation
•    Maintenance 
•    Troubleshooting 
•    Technical Support 

A copy of Western Power’s AM – POOOO – 24 – 362 kV Disconnectors and Earth Switches – Technical Schedule 

Registration Requirements

Suppliers are required to respond  to the following for the ROI submission:
•    Demonstrate track record and capability in delivering the Periodic Supply of Disconnectors and Earth Switches with a rated voltage of 362kV and a rated current of 4000A. 
•    In relation to the high-level Scope requirements stated above.
•    Reference from at least three customers who have been offered similar services.
•    Safety, Health & Environment information to be requested as part of this exercise.

To be considered for the inclusion in the Request for Proposal, please REGISTER your interest on the Western Power website link below by time (2PM) (AWST) Date Monday, 14 th November 2024.

Answer all questions listed in the Registration of Interest Questionnaire. If documents need to be attached to the registration, please send an email to mitul.doolabh@westernpower.com.au 

Please note that registering for the opportunity does not guarantee that you will be invited to participate in a market event or become a supplier of Western Power.

NEXT STEPS

Western Power will review and evaluate the registration received against the scope requirements.

Registrations of interest

Contact information

Contact information

Company information

Company information

Registration of interest

Organisation safety record (including any subcontractors working for you)

Has your organisation, including parent and subsidiary entities, been fatality free for the last five years?

Total Recordable Injury Frequency Rate (TRIFR) TRIFR further information

Total Recordable Injury Frequency Rate (TRIFR) TRIFR further information

Supporting documents

Supporting documents

Drop a file here or browse to upload

Allowed file types: JPG, PDF, XLSX

Maximum upload size: 30 mb

An error has occurred while getting captcha image