Skip to content

Large commercial connection

share icon

Who is this for?

For people wanting an industrial or commercial electrical supply with a maximum demand greater than 1300A/1000kVA.

clock icon

How long will it take?

3 months to provide you with a technical assessment

8-12 months to provide you with a design and quote, depending on the complexity of your project

3 months to construct, upon payment of quote and confirmation your site is ready

Timeframes indicative only and subject to change based on demand.

dollar icon

How much will it cost?

We'll provide a quote after we complete the scoping and design of your project.

Application fee

Application fee (plus 0.59% credit card surcharge) $497.42

Design fee

Project complexity Fee
Standard $1,320
Detailed $3,300
Complex $6,600

* While the design fee is GST inclusive, the GST exclusive amount will be deducted from the access offer if proceeding, i.e. GST is not refunded

Other fees

Description Fee
Construction costs We will provide a quote
Cancellation fee $550

The cost of an electricity supply is dependent on how much power you require. In most cases, the cost will be based on what we call the Distribution Low Voltage Connection Scheme.

 

This is for connecting power to a property where there has never been a connection to the Western Power network before. If you simply need to reconnect an existing connection, then please speak to your retailer to set up a new account.

Application process

You’ve applied
1

We’ll contact you to discuss your application.

You’ll receive a scope
2

After our technical assessment we’ll confirm the scope of works with you.

You’ll receive design fee invoice
3

Once payment is received, we will design the project to your needs.

You’ll receive a quote for the delivery of the works
4

After the acceptance and payment is received, we’ll schedule the works for delivery. Schedules are dependent on your location and the complexity of our work.

Let us know how we went
5

Your feedback is importance to help ensure we’re meeting your needs and expectations.

The services of a National Engineering Register (NER) engineer will be required to advise in general on the process to be followed, the system design, and the equipment to use.

The site’s electrical retailer is required to submit an ETAF (Electricity Transfer Application Form) to Western Power and a service request to change the site’s meter to bi-directional (required regardless of whether the generator is exporting or not). These must be completed before an Approval to Operate can be released.

What to include with your application

circle check orange

A CAD site plan

Your CAD plan helps us better understand your work site and location of assets. We extract data from your plan to assist us with your design.

Site plan for a large commercial connection

For a CAD site plan to be accepted, it must clearly show:

  • the proposed pillar location in a visible colour on the site plan.
  • the street name on which the property borders.
  • the full address of the property.
  • the nearest intersection (for rural properties it helps to locate the site)

 

In order to provide a fast, accurate quote and advice on your new connection arrangement we require a comprehensive site plan with details of your current and/or proposed site layout. This includes but is not limited to the following information being clearly marked on your plan:

  • boundary or retaining walls at the side and front of the property - including depth of wall
  • location of items such as letterboxes, garden beds, trees/stumps, driveways, crossovers
  • detail or grades of any major inclines or slopes near the front boundary
  • utility locations for water meters/pipes, gas pipes, sewer mains/connections and access points
  • proposed location of new pillar/s

 

Example site plan

commercial

Pillar exclusion zone

The pillar needs to have an exclusion zone of 50cm from its centre. Inside or under the exclusion zone there must not be any:

  • water pipes, water storage facilities or water meters
  • gas pipes or meters
  • telecommunication cables
  • sewage, waste water, or storm water pipes
  • reticulation pipes or cables
  • tree roots and other vegetation
  • concrete, asphalt, limestone or bedrock

 

Find out what underground assets may be in the vicinity by submitting a Dial Before You Dig application.

Pillar exclusion

circle check orange

Site photos

Help us understand your current connection arrangements and more easily identify potential site-specific issues. Photos will need to include:

  • The extent of the worksite
  • Any obstructions in the area

Site photos for a large commercial connection

Site photos help us understand your current connection arrangements and more easily identify potential site specific issues. If you're able to supply us with a close up and wide photos it will potentially reduce application times as we won't be required to visit the site.

close up

 

wide

circle check orange

Neighbours authority

If your project will impact your neighbour’s property by having new assets installed or relocated on or in front of their property, you’ll need their authorisation.

circle check orange

Single line diagram

A single line diagram provides us with the technical information to design a connection to meet your requirements.

circle check orange

Statement of compliance to AS61000.3.6

Your accredited electrical contractor or consultant must submit a statement verifying that the installation complies with AS/NZS 61000.3.11, SA-SNZ TR IEC 61000.3.14 and Western Power’s Technical Rules.

circle check orange

Disturbing loads

The information allows us to check the impact of your loads on the network. You must comply with Power Quality limits as per AS/NZS 61000.3.11, SA-SNZ TR IEC 61000.3.14 and Western Power Technical Rules.

circle check orange

Load breakdown

Your load breakdown allows us to assess the impact your project will have on the network. It also allows us to apply the appropriate charging policy.

circle check orange

Permission from your strata company (if applicable)

Your load breakdown allows us to assess the impact your project will have on the network. It also allows us to apply the appropriate charging policy.

circle check orange

Western Power substation compliance checklist

Please complete Part A of this checklist and submit as part of your application to demonstrate compliance to Western Power’s substation design requirements.

Substation compliance checklist

Ready to apply for a large commercial connection?

Once you’ve gotten the above, you are ready to apply. Estimated time to complete: 10 minutes

Questions about commercial connections