Final Report
The SKM Sustainability Assessment Report for the proposed Eneabba to Moonyoonooka 330 kV transmission line is now available to download online. This report details the extensive consultation and investigation that has been undertaken over the past several months, culminating in the recent recommendation of 'Option 10' as the preferred corridor for the project. It also provides a summary of the sustainability assessment that rated 16 possible corridor options in against a series of social, environmental, economic and technical principles.
Stage 1 - Eneabba to Moonyoonooka 330kV transmission line
If you are having trouble downloading this document, please contact the project team on 1800 617 771.
Appendicies
Appendix A
Appendix B
Appendix C
Appendix D Stakeholder Correspondence
- Appendix D Stakeholder Correspondence (available on request)
Appendix E Design parameter workshops
Appendix F
Appendix G Community workshops
- G.1 - Sustainability principles feedback form
- G.2 - Community workshop summary report (coming soon)
- G.3 - Summary spreadsheets for sustainability principles feedback
- Moonyoonooka community workshop
- Dongara community workshop
- Eneabba community workshop
- Brian Logan community meetings
- Summary of Sustainability Principles Rankings from Workshops
- Summary of all Sustainability Principles Rankings
- G.4 - All community issues raised at the Community Workshops
- G.5 - Mapped constraints
- Mapped community feedback - Map N1, N2, N3, N4, N5, N6, N7
- Mapped community feedback - Map M1, M2, M3, M4, M5, M6, M7
- Mapped community feedback - Map S1, S2, S3, S4, S5, S6, S7
Appendix H Corridor options
Appendix I Post Community Workshop Attendees
Appendix J Draft Sustainability Assessment Scoring
Appendix K Verification workshops
Appendix L Final Sustainability Assessment Scoring
Appendix M
Appendix N Project newsletters