The HV subdivision pool allows the cost of installing high voltage infrastructure to be shared among developers of residential subdivisions. The pool pays developers who have paid for more than their share of the HV infrastructure, and collects funds from developers who make use of excess capacity on that infrastructure.
More information about how the HV pool works and how payments and charges are determined can be found in the UDS manual (PDF 2.77mb).
The following table gives the current charges and parameters under which the HV Pool operates. These charges and parameters are updated every six months or when the HV Pool balance is seen to be trending towards a larger deficit balance, whichever comes first.
| Field Description | Size & Units |
|---|---|
| HV Pool System Charge | $321 /kVA |
| Baseline Accumulated HV Pool Payment at the time of the System Charge Re-set | $9,743,049 |
| Baseline Accumulated Design Load at the time of the System Charge Re-set | 41,267 kVA |
| Baseline System Charge at the time of the System Charge Re-set | $236 /kVA |
| Date of the HV Pool System Charge Reset | 16/11/2009 |
| Accumulated HV Pool Payments at the time of the System Charge Re-set |
$99,312,737 |
| Accumulated HV Pool Charges at the time of the System Charge Re-set | $96,326,993 |
| Accumulated Design Load at the time of the System Charge Re-set | 442,639 kVA |
| HV Pool Balance at the time of the System Charge Re-set | -$2,985,744 |
The following table provides information on the ongoing performance of the HV Pool. These indicators are updated on a monthly basis.
| Date of the last Performance Indicators update | 28/02/2010 |
|---|---|
| Graph of 200 job moving average of the HV Pool Refund rate with a linear trend line. The baseline system charge is taken at the point extrapolated out 3 months along the trendline. | ![]() |
| Current Accumulated HV Pool Payments since inception | $103,122,502 |
| Current Accumulated HV Charges since inception | $99,873,948 |
| Current Accumulated Design Load since inception | 455,045 kVA |
| Current HV Pool Balance | -$3,248,553 |
| Estimated date of the next System Charge Review | 16/4/2010 |