All network charges will be charged to the person making the application for service. Network charges as at 01/04/2009 for standard supply. (See end note for standard supply definition)

Some services/fees attract GST.

Purpose Service Charges GST
Customer connection To provide an overhead service or upgrade to customer point of supply or connect underground consumer main (up to 63 amp)

$272.00

No GST

Supply disconnect/ reconnect Disconnection/reconnection of overhead service leads or underground consumer mains at the customer request (up to 63 amp)

$250.00

+ GST

Upgrade of underground service Single-phase  – 1

$227.00

No GST

Temporary builders supply – overhead Single-phase – 1

$300.00

+ GST

Temporary builders supply – overhead Three-phase – 3

$600.00

+ GST

Pole to pillar

Subsidised cost up to three dwellings per lot

(More than three dwellings per lot is considered a subdivision development at full cost)

* Further conditions apply: Please refer to the Residential Connections section for more details on whether your connection is eligible for this subsidised rate.

One dwelling $681.00*

Two dwellings  $1362.00

Three dwellings $2043.00

No GST

Project cancellation May be charged if project is changed by customer
Administration charge - Cancellation or scope change prior to commencement of construction plus design cost incurred

$550.00 plus design costs

+ GST

An administration charge may be charged if job is cancelled or scope change after construction commenced plus costs incurred on project prior to cancellation or scope change

$550.00 plus costs incurred

+ GST on admin only

Western Australian Planning Commissin WAPC amendment to previously cleared plan

 $58.00

+ GST

WAPC incorrect/insufficient detail provided to enable clearance

$115.00

+ GST

Underground distribution schemes & Subdivision charges Feasibility Enquiry
Feasibility Study

$315.00
$775.00

+ GST

Design information package

$495.00

+ GST

Charge for bonds/clearances (pre 1st July 2007)
Per Lot Fee (PDF 28kb)

$363.00
$165.00/lot

+ GST

Design conformance review per stage
Plus Variable Charge
$363.00
$38.50

+ GST

Variable charge per lot $5.50

+ GST

Design re-conformance review per stage
Plus Variable Charge
$242.00
$27.50

+ GST

Quality assurance $959.00 No GST
Variable charge residential lot $5.00 No GST
Variable charge commercial/industrial per metre of trench $0.71 No GST
Part payment arrangement Administration fee will be charged for changes by the customer to the normal payment scheme offered $550.00

+ GST

 

Note: Western Powers standard supply is up to:

  • Single phase:63A(urban areas)/ 32A(rural areas and towns) or
  • 32A per phase for multiphase(all areas) and/or
  • Consumer mains size of 35mm2 (all areas)

To view PDF files you will need Adobe Acrobat Reader.

Customers with accessibility issues.

Page update on 15 February 2010